BIM Lead
Mar 2024 – Present
Led BIM process implementation for final design stage of lift systems for major rail infrastructure project. Integrated multi-discipline BIM models and resolved complex clashes with other Specialist Works Contractors (SWCs) to ensure seamless installation coordination. Managed drawing amendment workflows with senior design management, incorporating feedback from consultants, architects, and main contractors. Utilized BIM 360 and ACC platforms for centralized collaboration and quality control.
RailElectrical
KONE Elevators (Singapore) — Jurong Regional Line (LTA)
BIM Coordinator
Aug 2022 – Present
Managed BIM workflows across multiple concurrent major rail infrastructure packages including Thomson-East Coast Line (TEL), Rapid Transit System (RTS) cross-border link, and East-West Line (EWL). Coordinated and integrated multi-discipline models to detect and resolve conflicts across complex rail station environments. Supervised technical team members in consolidating as-built drawings and models to stringent LTA and project as-built documentation standards, ensuring accurate handover deliverables.
RailElectricalStructure
KONE Elevators (Singapore) — TEL (LTA), RTS (Johor–Singapore), EWL (LTA)
Produced comprehensive shop drawing packages (plans, elevations, sections, materials schedules) for lift cars and escalator systems across diverse project portfolio of 9 major developments spanning institutional, residential, commercial, and educational facilities. Coordinated design iterations with Project Managers and systematically addressed feedback from consultants, architects, and main contractors. Delivered tender-ready PDF documentation and BIM exports for contractor procurement and fabrication.
RoadElectricalArchitectureStructure
AcePLP (for OTIS Elevators) — ICA New Wing; Dairy Farm; Pullman; Civil Academy @ Jalan Bahar; Coastline Residences; OCBC Tampines; Punggol Nursing Home; Trinity Church; NUS Wind Tunnel
Drafter / BIM Modeller
2020
Updated as-built drawings for Marina Coastal Expressway (MCE) road infrastructure amendments and developed detailed 3D BIM models for visualization and analysis. Utilized Dynamo scripting for parametric architectural modeling automation. Conducted comprehensive research and simulation of flood mitigation scenarios and underground tunnel feasibility using InfraWorks and Civil 3D for URA planning studies. Coordinated multi-platform workflows integrating Bentley toolsets (MicroStation, PowerRail) with Autodesk platforms for seamless data exchange.
RoadArchitectureStructureElectrical
AcePLP — LTA Road Amendments (MCE-C482); URA Feasibility Study (Flood/Tunnel)