BIM Coordinator
Oct 2022 - Jan 2023
Coordinated between the Modeler and Client when discussing any issues and concerns when amending the drawings of the project as well as clearly stating the process for outgoing drawings to be officially sent out. Conducted meetings between myself, the client and the Modeler to discuss issues during the submission process. These meetings also included the standardization of the file names, locations and process when submitting the amended drawings.
RailElectrical
Netlink Amendments for Bishan and King Albert Lines
BIM Engineer / BIM Coordinator
Jan 2021 - Nov 2022
Coordinated with other BIM Modellers to instruct them on their roles and track their progress. Recreated the entire model using the updated Templates according to the Coordinates provided by the Client. Generated custom 3D models, such as Staircase Exits, Cross Passages, Slip Road Curbs, Combined Services Niches according to their specifications and imported them over to the model. Edited Road Templates according to As-Built specifications. Generated the properties of the DE107 Road Models as well as embedded the Structural Information into each Model Element. Provided on-the-job training (OJT) to several BIM Engineers on the basics of OpenRoads Design software, focusing on the QC checking of the 3D model and Templates creation.
RoadStructure
DE107 - MCE Road Amendments
BIM Engineer
Sep 2021 - Feb 2022
Generated a 3D Model of the Rings by individual Segments and details as a Family Part for both the Changi Alignment and Woodlands Alignment. Extracted the X, Y & Z Coordinates from the AutoCAD Drawings and exported those values to Excel to place the Family Rings at their correct coordinates and elevations. Used the Dynamo System to create the code needed to extract, read and place the Family Rings at their correct positions according to their Alignment extracted from the AutoCAD drawings. Created a code that rotated the Rings to cover the gaps that were showing.
RailStructure
Changi T316 3D Model - TBM Ring/Tunnel
BIM Modeller
Jun 2021 - Feb 2022
Conducted research on Revit/dRufus/BEXEL for BIM coordination and quantity takeoff workflows. Generated schedules to map out the process of a project as well as the time taken for each system placement in Synchro 4D. Generated a set of coding using the built-in Synchro Script to better utilize the scheduling of the Project with its assigned materials. Generated 3D Path and Equipment Motion animations. Generated Surfaces, Grading and Analysis of the Cut and Fill Volume between two Surfaces using Civil 3D. Generated Corridors along an Alignment Path, as well as generated an Assembly made of Sub-Assemblies to build a layered road.
StructureArchitecture
Takenaka Corporation - BIM Research and Development
CAD Drafter
Sep 2021 - Sep 2021
Generated a Layout Plan of the Condo Unit and Terrace, as well as provided Annotations and Scale of the drawing.
Architecture
Palm Haven Layout Drawing
CAD Drafter
May 2021 - May 2021
Generated a Layout Plan of the 3rd Storey building, as well as provided Annotations and Scale of the drawing according to the given instructions from the Client.
Architecture
Type E1 Layout Plan
CAD Drafter
Oct 2020 - Nov 2020
Edited Cable Tray/Trunking layout plan according to information provided by client. Edited Wiring Diagram according to information provided by client.
PlantElectrical
CSP0153 Condensate Polishing Plant - JAWA 1
BIM Modeller
Sep 2020 - Oct 2020
Edited Road Templates for C482 according to As-Built specifications. Placed edited Templates according to their specific Coordinates according to As-Built specifications. Generated a Step-by-Step Process Report.
RoadStructure
DE107 - MCE Road Amendments (Early Stage)
CAD Drafter
Mar 2020 - Aug 2020
Generated and edited 2D Wiring Diagrams, Unit and Rackface layout details across various systems for Communications Integration. Routed cable from source to destination in Cable Plan. Routed cable from source to destination stationwide for various stations & levels. Generated various Terminal Block Assignments. Generated 2D Isometric Detail Drawings for the typical installation for the Cable Tray/Trunking & Display Panels.
RailElectrical
Communications System for North East Line Extension (NELe)
CAD Drafter
Jan 2020 - Mar 2020
Generated and edited 2D Panel drawings. Updated the found faults on site Panel. Generated shop drawing for Panels with the client's titleblock format. Troubleshooting cables to the correct destination for easy visualization of the electrical schematic.
RailElectrical
Mandai Depot Project
BIM Modeller
Dec 2019 - Feb 2020
Generated a 3D building model of P11 – Venture Trail Pavilion Chinese Garden to specified dimensions. Modified existing 3D models to updated dimensions and constraints. Generated Shop Drawings (titleblocks) with client's titleblock for projects including P1 – Amenities Block and P9 – Water Lily Workshop.
Architecture
Jurong Lake Garden Project
Trainee CAD/BIM Engineer
2019 - 2020
Completed comprehensive 2-month training program covering AutoCAD & MicroStation 2D (architectural drawings with CP83 compliance, electrical schematic diagrams, site plans, mechanical parts documentation, isometric diagrams, 3D mechanical parts), Revit Architecture (project datums, SVY21 coordinates, 3D modeling with architectural elements, custom parametric families, rendering, central models and local files, technical drawings for construction/tender stages), Revit Structure (building structural basics, Copy/Monitor for linked models, 3D structural modeling, technical drawings), Revit MEP (building services concepts and standards, M&E element modeling for different services, Transfer Project Standards, Batch Copy for fixtures, custom parametric families, Revit Interference Check, Navisworks clash coordination and reports, documentation), Bentley OpenBuildings Designer (architectural modeling with space catalogues, structural modeling with columns/beams/piling, M&E services modeling with duct and pipe routing), and Bentley OpenPlant (process units and services setup, pipe systems management, BOQ reports, clash detection).
ArchitectureStructureElectricalPlumbing
AcePLP 2-Month Skills Training Program