Enhanced Construction Planning with 4D BIM

Combine project schedules with federated BIM models to create a compelling 4D sequence for tender presentations and project planning.

Loading video...

500+
Projects Completed
20+
Years Experience

What's Included

Here’s what we deliver when you engage us for 4D BIM sequencing.

Visual Construction Planning

Link schedule milestones to BIM elements for visual validation of build sequences, identifying conflicts and optimizing site logistics before mobilization.

Client-Ready Presentations

Generate high-quality 4D animations with multiple camera angles. Communicate complex construction plans clearly to stakeholders and clients.

Pre-Construction Validation

Test build sequences virtually to identify access issues, crane positioning, and temporary works needs. Validate constructability before committing resources.

Our Process

Our 4D Construction Workflow

Our streamlined approach ensures quality 4D BIM delivery.

1

Upload Files

Share your CAD plans, 3D models, or schedules on the Bimeco Platform. Our team reviews the files within 2 working days.

2

Build the 4D

We use industry-leading tools like Synchro 4D to link your schedule with the BIM model, creating a realistic construction sequence.

3

Video Review

We prepare up to 3 recommended viewpoints and refine the sequence based on your feedback. Final videos are shared via the Bimeco Platform.

Best 4D Software

We integrate BIM models from leading platforms with enterprise scheduling software (Primavera P6, MS Project) for comprehensive 4D sequencing and visual timeline simulations.

Oracle P6
Revit
syncro-4d-software
OpenBuildings
Microsoft Projects

4D BIM Workflows

Why leading consultants and contractors incorporate 4D BIM.

Section image

Deliver Ahead of Schedule

Using Critical Path Analysis, contractors can sequence complex, concurrent site activities to find the fastest route to completion. Studies report up to 20% reductions in overall project lead times.

Section image

Win More Bids

4D BIM showcases your ability to execute complex site works. Including 4D simulations in tender submissions often improves win rates, with measurable improvements in contractor selection outcomes.

Section image

Reduce Project Risks

Complex schedules in MS Project or Primavera P6 can be difficult for site teams to interpret. A 4D BIM sequence turns them into an intuitive, time-linked animation that helps crews coordinate work and reduce overruns.

Our 4D Projects

We have delivered countless 4D BIM projects. Here are some highlights.

Airport Civil Walkthrough

Civil Walkthrough for Airport

Integrated the tender BIM model with the construction schedule in Synchro 4D to showcase how the airport’s tunnels connect, providing stakeholders with a clear, phased walkthrough of the substructure.

Industrial Plant Walkthrough

Safety Demo for Industrial Plant

Produced a facility walkthrough using the as-built BIM model, providing an engaging tool for safety training, presentations, and marketing campaigns.

DE 107 Rail Project

DE 107 Rail Project

Combined a BIM model with an Oracle Primavera P6 schedule to visualize the construction sequence of an underground station.

Frequently asked questions

What exactly will you deliver if we engage you for 4D BIM?
We deliver a 4D BIM model that links construction activities to your schedule, allowing stakeholders to visualize the build sequence over time. Deliverables can range from tender-level simulations to fully detailed LOD 500 models.
Do we need a BIM model ready before engaging you?
Not necessarily. If you already have a BIM model, we can integrate it directly with your schedule. If not, our BIM team can help develop one based on your drawings and project requirements.
How accurate is the 4D sequence?
Accuracy depends on the detail of your schedule and model. With a well-defined programme and coordinated BIM model, our 4D simulations closely reflect site progress and potential risks.
How long does it take to prepare a 4D BIM sequence?
Setup typically takes 2–4 weeks depending on project size and model quality. We also update the sequence as your schedule evolves to keep it aligned with project milestones.
What software do you use?
We primarily use Synchro 4D and Navisworks, but can adapt to client-specified platforms. Models can be delivered in native formats (e.g., Revit, Archicad, Tekla) and open standards such as IFC.

Here's what our clients have to say.

Faiz understood our piping systems well and flagged design issues before coordination meetings. Working with their BIM team is seamless.

Annie P.

BIM Manager

Our timeline was tight, but Bimeco quickly added team members to meet our submission deadlines. Very responsive and reliable.

Dave

Project Manager

Their clash detection reports were thorough and saved us significant rework costs. The weekly coordination calls kept everyone aligned.

Jason Ang

Project Manager

Ready to Work with BIM Coordination Experts?

Let our experienced team handle your BIM coordination so you can focus on building. Schedule a free consultation to discuss your project needs.

Meet urgent deadlines with a scalable BIM team
Flexible service packages for any project size
Dedicated coordinator assigned to your project
+65 80834020
enquiry@bim.com.sg

Request a Consultation

Free consultation. No obligations.