Project-based BIM Services

Clash-free, coordinated BIM models delivered on schedule by Singapore-based coordinators. From data centers and rail stations to airports and water plants, we deliver quality models with defined scope and pricing for consultants and contractors.

BIM Services - Plant Modeling

Our Certifications

STAS RegistryISO 9001:2015 CertifiedbizSAFE Level 3
437
Projects Completed
200+
BIM Professionals
21
Years Experience

Why Choose Us?

Here's why consultants & contractors choose Bimeco for BIM Delivery

Model Quality

Models match your exact project requirements—whether IFC4 exports or CORENET X submissions—meeting naming standards and data specifications.

Fast Turnaround

Clash revisions and drawing updates delivered in hours, not days—so contractors don't wait idle on-site for resolved coordination issues.

Reduce Site Risk

Our coordinators run virtual clash reviews to catch spatial conflicts, buildability issues, and coordination errors before construction—preventing costly site rework and schedule delays.

How We Work

Clear scope from day one, delivered on your schedule

01

Project Scope

Align on deliverables, timeline, and team structure upfront so there are no surprises later.

02

BIM Modelling

Milestone-based delivery so construction stays on track.

03

As-Built Handover

Ongoing support until handover to deliver accurate as-built BIM.

Project BIM Support

Track model progress across Design, Construction, and Handover in real-time.

BIM Project Dashboard - Milestone Tracking Platform

Keep track of BIM deliverables within our integrated sharing environment

Specialist Matching

Projects are automatically matched to coordinators based on industry vertical (offshore/marine, datacenter, healthcare, commercial) and discipline specialization.

Stay on Schedule

Weekly reviews with the project team to validate model quality, catch clashes, and ensure buildability.

Quality Assurance

Internal clash checks and validation on every deliverable before handover to ensure data standards are met.

Specialists in Your Sector

Expert coordination for complex projects: data centers, rail systems, airports, and industrial facilities.

23 projects

Rail & Transit

MRT stations, depot facilities, and rail infrastructure coordination. Experience with transit authority standards, track alignment, station MEP systems, and multi-contractor coordination for major rail projects.

14 projects

Plant & Industrial

Water reclamation plants, power generation facilities, and industrial complexes. Expertise in utility authority standards, complex piping systems, equipment integration, and P&ID coordination for critical infrastructure projects.

12 projects

Roads & Highways

Highway interchanges, expressways, and road infrastructure. Experience with transportation authority standards, drainage systems, utility coordination, and civil-structural integration for major road development projects.

5 projects

Airport Infrastructure

Terminal facilities, airside infrastructure, and aviation support systems. Familiar with aviation authority requirements, baggage handling systems, passenger flow coordination, and critical MEP systems for airport expansion projects.

Our Favourite BIM Tools

BIM Software like Revit, ArchiCAD, BIM Collaborate Pro, and Tekla have workflows unique to its software ecosystem. We find the BIM professionals trained in your software of choice.

Autodesk Revit
ArchiCAD
BIM Collaborate Pro
Tekla Structures
Autodesk Navisworks

Project Results

See how we've helped consultants and contractors deliver coordination-ready models across different industries.

KONE Jurong Regional Line Rail Infrastructure
Rail

Jurong Regional Line (LTA)

Challenge

Multi-contractor coordination for lift systems integration across major rail infrastructure project, requiring resolution of complex spatial clashes with Specialist Works Contractors and alignment with LTA's strict regulatory timeline.

Delivered

  • BIM 360/ACC collaboration platform
  • Clash resolution with structural & MEP systems
  • Multi-contractor drawing coordination

Result

  • Zero critical clashes in final design
  • Met LTA regulatory submission deadlines
Tuas Water Reclamation Plant Infrastructure
Water

Tuas Water Reclamation Plant (PUB)

Challenge

Complex equipment integration and stakeholder alignment across multiple project phases for Singapore's largest water reclamation facility, requiring strict compliance with PUB guidelines and coordination between P&ID, electrical, and plumbing systems.

Delivered

  • Equipment integration with BIM models
  • PUB guideline compliance documentation
  • ProjectWise submission workflows

Result

  • Consistency across all project phases
  • Regulatory compliance for 800K PE facility
Keehans Integrated Construction & Prefab Hub
Structure

Integrated Construction & Prefab Hub

Challenge

Complex steel façade frame coordination requiring accurate representation of primary framing, secondary supports, brackets, and connection interfaces while managing clashes with architectural façades, structural frames, and MEP systems across multiple disciplines.

Delivered

  • Steel façade BIM model (Revit) with advanced detail submission
  • Construction shop drawings & connection details
  • Multi-discipline clash resolution via ACC

Result

  • Coordinated façade-structure-MEP interfaces
  • Construction-ready shop drawings with accurate LOD/LOI

Frequently Asked Questions

What is the cost of BIM?+

Pricing is project-based, depending on duration, complexity, and number of trades. Costs vary based on your role—consultant, main contractor, or subcontractor. Use our BIM Calculator to estimate your project cost, or reach out for a detailed scoping call.

How do you scope a project?+

We start by reviewing your tender documents, contract scope, and design drawings. Then we create a deliverable schedule that breaks down your contract into specific BIM outputs (clash reports, coordinated models, shop drawings, etc.) with milestone dates. You receive this scoping document before any modelling work begins, so there's no ambiguity about what gets delivered and when.

What's included in the scope?+

We model items within your contractual scope—whether you're a consultant, GC, or subcontractor. For elements outside your scope, we can run clash checks to resolve interface issues. For design-build projects, we can handle full BIM delivery.

What BIM software do you use?+

Revit, ArchiCAD, Tekla, OpenBuildings, AutoCAD, Autodesk Construction Cloud, ProjectWise, and others. We also support OpenBIM/IFC workflows where required.

What Level of Detail do you deliver?+

LOD increases progressively from design through construction to operations. We model at the appropriate level for each stage to meet submission deadlines without over-modelling. If you have specific Model Content Requirements, share them before we begin.

Do you provide surveying or scan to BIM services?+

We don't provide surveying or scanning services. However, if you already have point cloud data, our BIM team can work with you to incorporate it into your BIM submissions.

Here's what our clients have to say.

Ahmad and Faiz can follow up on what is required and needed and they are good on what they are doing. Highly recommended since the skills are there and always coming on-time. I like with them is they give some ideas on how to solve some issues in the 3d model and do the thing quite fast which is very quite impressive for me. Keep up the good work.

John Lester Baconawa

Senior Project Engineer

Peak Top Engineering Pte Ltd

MEP Coordination

Excellent service across all aspects - from responsiveness to quality of work. The team demonstrated strong technical knowledge and delivered on time consistently.

Masita Deei

Technical Project Manager

Vector Foiltec Pte Ltd

BIM Modeling

Outstanding quality and turnaround time. Dandiyar provided excellent technical advice and was very prompt in responding to queries. Highly satisfied with the products and services.

Princess Rogando

Design Engineer

Concord Corporation Pte Ltd

Structural BIM

Overall satisfied with Su Latt Tun's work. Good quality of advice, timely follow-up, and solid deliverables. There's always room to improve, but the service met our expectations.

Chris

Manager

KEEHANS PTE LTD

BIM Coordination

Ben is very helpful and professional. Great experience working with the Bimeco team.

Kurita - Yanping

Manager

Kurita Singapore

BIM Services

Ready to Work with BIM Coordination Experts?

Get a clearly scoped deliverable plan before any modelling begins.

Clearly scoped deliverables before work begins
Industry-specialist coordinators matched to your project
Milestone-tracked delivery with full visibility
+65 80834020
enquiry@bim.com.sg

Request a Consultation

Free consultation. No obligations.