Developed and managed schedules from design to construction stage, ensuring smooth workflow and adherence to timelines; Led coordination meetings with consultants and contractors, resolving project bottlenecks efficiently; Tracked progress, monitored quality, and optimized procurement schedules to meet project requirements.
Rail
C911 – Design and Construction of Depot for Downtown Line (Gali Batu Depot), Singapore
Developed recovery strategies to align project progress with contract milestones; Analyzed baseline vs. actual progress and prepared EOT claim reports; Assessed delays, identified critical areas, and ensured compliance with contractual deadlines.
Road
ER529 - SENJA / KRANJI EXPRESSWAY (KJE) INTERCHANGE
Developed and structured the Master Schedule from funding to construction phases; Analyzed risks, optimized major milestones, and simulated various construction methodologies; Ensured contractors' baseline programs aligned with overall project goals.
Airport
Singapore Changi Airport – Terminal 5
Reviewed and monitored contractor baseline programs to ensure alignment with project schedules; Managed EOT claim assessments and provided strategic planning recommendations; Led progress tracking and facilitated resolution of scheduling conflicts.
Airport
Singapore Changi Airport – Intra Airside Road Connection for Changi East (ARC)
Developed program planning timelines for PUB contract adherence; Evaluated and approved contractor baseline programs while identifying scheduling risks; Assessed construction methodologies to optimize efficiency and minimize delays.
Deep Tunnel Sewerage System Phase 2 (DTSS2), Singapore
Developed baseline schedules with resource-loaded productivity rates; Created S-Curves and risk assessments to track and optimize project progress; Designed an Activities Movement Chart to streamline major trade coordination.