Clash-Free BIM. Built Around Your Programme.

BIM coordination for consultants and contractors in Singapore. Get your Architectural, Structural and M&E models federated into a construction-ready BIM.

We handle clash detection, multi-discipline coordination, and CORENET X submissions so your programme stays on track from tender to handover.

BIM Services - Plant Modeling

Our Certifications

STAS RegistryISO 9001:2015 CertifiedbizSAFE Level 3
437
Projects Completed
500+
Clashes Resolved
21
Years Experience

How We Work

Clear scope from day one, delivered on your schedule

01

Project Setup

We review your project documents, drawings, and consultant models to define scope, disciplines, and delivery milestones aligned to your programme.

02

Multi-Discipline Coordination

We coordinate Architectural, Structural and M&E models into a single federated BIM, working directly with your subcontractors to close model gaps where needed.

03

Clash Resolution

We run full clash detection across all disciplines and deliver a documented clash report before site mobilisation. Issues resolved, not just flagged.

What You Get

Deliverables built for main contractors coordinating multiple trades on a live programme.

Federated Multi-Trade Model

Architectural, structural, and M&E models from your subcontractors federated into a single coordinated BIM. All disciplines clash-detected and resolved before they reach the site. Delivered in your project's native format plus IFC export, at the LOD your project stage requires. IFC+SG compliant where CORENET X submission is needed.

Federated BIM model with multi-trade coordination

Clash Detection Report

Documented report identifying all hard, soft, and workflow clashes across disciplines. Each issue classified by severity, location, and responsible party. Delivered in PDF and exportable to Navisworks, BIM Collab, or Solibri. Issues resolved, not just flagged.

BIM clash detection report with severity classifications

Deliverable Schedule & Scope Document

Your contract broken down into specific BIM outputs with milestone dates tied to your construction programme. Fixed-scope pricing attached. Issued before any modelling begins, so there is no ambiguity about what gets delivered, when, and at what cost. Updated as the project progresses if scope changes.

BIM deliverable schedule aligned to construction programme

Send Us Your Drawings for a Scope Review

Share your project documents and we will come back to you with a deliverable schedule, timeline, and fixed-scope proposal.

Why Choose Us

Coordination that keeps your programme on track and your models construction-ready.

Fast Turnaround

Same-day turnaround on urgent model changes and clash resolution updates. Your programme doesn't slip waiting on BIM.

Construction-Ready Models

LOD-compliant, clash-free models built to be constructed, not just submitted. Every element classified and coordinated across all disciplines.

Reduce Site Risk

Clashes identified and resolved before you break ground. Your M&E subcontractors are coordinated into the federated model. Fewer surprises, less abortive work on site.

Sector-Specific Coordinators

Each project is assigned a coordinator with direct experience in your sector, whether that's rail, plant, data centres, or commercial. They know the standards your project requires.

Stay on Schedule

Weekly reviews with the project team to validate model quality, catch clashes, and ensure buildability.

Quality Assurance

Internal clash checks and validation on every deliverable before handover to ensure data standards are met.

Specialists in Your Sector

Expert coordination for complex projects: data centers, rail systems, airports, and industrial facilities.

Commercial & Mixed Use

Hotel fit-outs, retail podiums, live MRT station sites. We coordinate architecture, structure, and M&E into a single federated model, handling LOD 400 shop drawings and as-built submissions under LTA operational constraints.

Institutional & Civic

No room for rework. We've coordinated BIM for Singapore General Hospital and a high-security Home Team facility, producing federated models that meet BCA and agency submission requirements.

23 projects

Rail & Transit

Tight sequences, multiple contractors, shared space. We've worked across MRT stations and depot facilities, aligning track, civil, and MEP models to transit authority standards and resolving clashes before they reach site.

14 projects

Plant & Industrial

Dense piping, equipment, and trade interdependencies. We model utility systems, coordinate P&ID against the 3D environment, and ensure what gets built matches what was designed. Critical for water reclamation and power generation projects.

12 projects

Roads & Highways

Long corridors with drainage, utilities, and structures crossing paths. We federate civil and structural models and produce documentation that holds up through LTA and URA submission cycles.

5 projects

Airport Infrastructure

Terminal architecture, baggage handling, airside MEP. All under strict authority oversight. We've worked on expansion projects where an accurate federated model upfront meant fewer surprises during limited airside access windows.

Rated 4.8/5 by Our Clients

Highly recommended — skilled team, always on time, and great at solving 3D model issues fast.

John Lester Baconawa

Senior Project Engineer

Peak Top Engineering Pte Ltd

MEP Coordination

Excellent service — responsive, technically strong, and delivered on time consistently.

Masita Deei

Technical Project Manager

Vector Foiltec Pte Ltd

BIM Modeling

Outstanding quality and turnaround time. Excellent technical advice and very prompt responses.

Princess Rogando

Design Engineer

Concord Corporation Pte Ltd

Structural BIM

Good quality of advice, timely follow-up, and solid deliverables. Service met our expectations.

Chris

Manager

KEEHANS PTE LTD

BIM Coordination

Ben is very helpful and professional. Great experience working with the Bimeco team.

Kurita - Yanping

Manager

Kurita Singapore

BIM Services

Our Projects

Real projects where we federated the models, resolved the clashes, and delivered on programme.

KONE Jurong Regional Line Rail Infrastructure
Rail

Jurong Regional Line (LTA)

Challenge

Multi-contractor clash coordination across a major rail infrastructure project, with strict LTA regulatory submission deadlines.

Delivered

  • BIM 360/ACC collaboration platform
  • Clash resolution with structural & MEP systems
  • Multi-contractor drawing coordination
Tuas Water Reclamation Plant Infrastructure
Water

Tuas Water Reclamation Plant (PUB)

Challenge

Equipment integration across multiple phases of Singapore's largest water reclamation facility, with strict PUB compliance requirements.

Delivered

  • Embed COBie information into BIM models
  • Managed submission in compliance with ISO 19650 requirements
  • Coordination with structural engineers
Keehans Integrated Construction & Prefab Hub
Structure

Integrated Construction & Prefab Hub

Challenge

Steel facade coordination requiring accurate primary framing and connection interfaces, with clashes across structure and MEP disciplines.

Delivered

  • Steel facade BIM model (Revit) with advanced detail submission
  • Construction shop drawings & connection details
  • Multi-discipline clash resolution via ACC

Our Favourite BIM Tools

Revit, ArchiCAD, Tekla, Navisworks, BIM Collaborate Pro. Your coordinators are trained in the platform your project already uses.

Autodesk Revit
ArchiCAD
BIM Collaborate Pro
Tekla Structures
Autodesk Navisworks

Frequently Asked Questions

How do you scope a project?+

We start by reviewing your tender documents, contract scope, and design drawings. Then we create a deliverable schedule that breaks down your contract into specific BIM outputs (clash reports, coordinated models, shop drawings, etc.) with milestone dates. We model items within your contractual scope, whether you're a consultant, GC, or subcontractor. For elements outside your scope, we can run clash checks to resolve interface issues. You receive this scoping document before any modelling work begins, so there is no ambiguity about what gets delivered and when.

How is pricing structured?+

Every engagement is priced on a fixed-scope basis. We review your project documents, define the deliverables (clash reports, coordinated models, shop drawings), and provide a fixed fee tied to that scope. You receive a deliverable schedule with milestone dates before any work begins, so there are no surprises on cost. The fee depends on project size, number of disciplines, and complexity.

Can you coordinate models from our M&E subcontractors?+

Yes. This is one of our most common engagements. We work directly with your mechanical, electrical and plumbing subcontractors to develop or enhance their models, then federate them with the architectural and structural models for clash detection and CORENET X submission.

Do you support CORENET X submissions?+

Yes. We prepare and coordinate the federated BIM model required for both Design Gateway and Construction Gateway submissions, including IFC+SG validation and clash resolution. The Qualified Person retains submission authority. We handle the model preparation and resolve any Written Directions.

What does a clash report look like?+

We deliver a documented clash report identifying all hard, soft and workflow clashes across disciplines, with each issue classified by severity, location, and responsible party. Reports are delivered in PDF and can be exported to your preferred coordination platform.

How long does a typical BIM coordination engagement take?+

It depends on the project. A single-discipline model update may take days. A full multi-discipline federated model with clash resolution can run across several weeks or months, depending on project complexity and the number of subcontractors involved. After reviewing your project documents, we can share a realistic timeline tied to your programme milestones.

Your next project needs a clash-free model.

Let's coordinate your BIM before you break ground.

Clash detection across all disciplines
M&E subcontractor model coordination
CORENET X Construction Gateway support
Same-day turnaround on urgent updates
Fixed scope, aligned to your programme
+65 80834020
enquiry@bim.com.sg

Request a Consultation

Free consultation. No obligations.